●111126B Bhutan, pib.nic.in
ブータン政府とインド政府の水力開発協力,2020年までに新規20GW規模で合意確認
India to Develop 10,000MW Hydro Power in
Bhutan http://bit.ly/rD3aZ7 http://my.reset.jp/adachihayao/111126X01.jpg http://my.reset.jp/adachihayao/111126X02.jpg http://my.reset.jp/adachihayao/111126B03.jpg
Ongoing cooperation between India and Bhutan
in the hydropower sector is covered under
the 2006 agreement on cooperation in Hydropower
between the two countries and the Protocol
to the 2006 agreement signed in March, 2009
thereof. 10,000 MWs of hydropower in Bhutan,to
India by 2020,Implementation Agreement,Punatsangchhu
HE Project Stage-I 1200, Punatsangchhu
HE Project Stage-II ,990,Mangdechu HE
Project 720,Government of Bhutan,effective
flood information sharing system,Minister
of State for Power Shri K.C.Venugopal
●111101A Bhutan,firstpost.com
ブータンのワンチュック国王,インドを訪問,両国の絆を確認
India, Bhutan vow to strengthen ties http://bit.ly/rss8vx http://my.reset.jp/adachihayao/111101A01.jpg
India and Bhutan today discussed important
international and bilateral issues, including
ways to strengthen cooperation between the
two countries in key areas like hydropower
sector.Bhutan King Jigme Khesar Namgyel Wangchuck,nine-day
official-cum-private tour,President Pratibha
Patil and Prime Minister Manmohan Singh,target
of 10,000 MW of power generation in Bhutan
by 2020,Rajasthan where he visited Jaipur,
Jodhpur and Udaipur, Royal Wedding on 13
October
●111009B Bhutn, kuenselonline.com
ブータンは今後10年で果たすべき10GWの水力開発と,河川環境の破壊のジレンマに悩む
Damming or damning rivers? http://bit.ly/r3UZnj http://my.reset.jp/adachihayao/111009X01.jpg http://my.reset.jp/adachihayao/110813X01.jpg
Is accelerated development of the hydropower
sector in conflict with the environment?Bhutan
ambitious plan to tap 10,000MW of hydropower
by 2020 (eight years and two months from
now) may be following a clean and green path,
but what has not been talked about is how
it might affect or permanently destroy the
country’s pristine riverine ecosystem.four
major river basins,Punatsangchhu having
three projects,Karma Chophel of the national
environment commission,aquatic invertebrates,Epiophlebia
laidlawi,nature conservation division, Sonam
Wangchuk,run-of-the-river schemes,Chukha
dam,backwaters,WWF vulnerability assessment
of Wangchuck centennial park in central Bhutan
states,ecologist Rebecca Pradhan of the
Royal Society for the Protection of Nature,15
projects planned or ongoing on about nine
rivers,720MW Mangdechu project,Jigme Singye
Wangchuck and Manas national parks,environment
impact assessment (EIA)
○110813C Bhutan, kuenselonline.com
ブータンで初めての無償抜き水力開発,124MWダガチュウ水力プロジェクト
Dagachhu Hydropower Project On track http://bit.ly/q6EnLw
Dagachhu hydropower project,Nu 5,220.53M,
out of USD 201.50M,97 percent complete,56
percent in manufacturing,corresponding to
Nu 8,160.75M,revised to Nu 10,918.59M,much
stronger Euro and USD,40 percent of the underground
excavation works, 73 Bhutanese including
support staff,EPC Contractor,M/s Hindustan
Construction Company Ltd,124MW project,Alstom
hydro and Andritz hydro,Druk Green Power
Corporation,59 percent share,Tata power of
India, 26 percent,National Pension and Provident
Fund 15 percent,power purchase agreement
(PPA)
●110113A Bhutan, thedailystar.net
ブータンのティンリー首相がダッカを訪問,バングラデシュのハシナ首相と会談
Bhutan to help in hydropower sector http://bit.ly/gxk28o
Hasina urges Thimphu to use Ctg, Mongla ports,Bhutan
yesterday assured Bangladesh of extending
cooperation in the hydropower sector, in
which the Himalayan country has huge potential.,Prime
Minister Jigmi Y Thinley,Prime Minister
Sheikh Hasina,Chittagong and Mongla seaports,Bhutanese
Foreign Secretary Dasho Daw Penjo,Brahmaputra,Sundarbans,Cox's
Bazar in Bangladesh,Father of the Nation
Bangabandhu,Sheikh Mujibur Rahman,Liberation
War in 1971,fourth King Jigmi Singye Waangchuc
●110113C Bhutan, thedailystar.net
ブータンのバングラデシュ訪問団はインドも入れた協議を強調
Bhutan for tri-nation talk http://bit.ly/ie8fze
Bhutanese Prime Minister Lyonchhen Jigmi
Y Thinley yesterday came up with an idea
of holding a tri-nation discussion among
Bangladesh, Bhutan and India to meet Bangladesh's
acute demand for electricity. four-day visit
to Bangladesh,10 mega hydraulic power projects,completed
by 2020,on equity share basis or direct
purchasing from Bhutan,Chittagong and Mongla
seaports,Prime Minister Sheikh Hasina,hydropower,
water resources management,other regional
and international forums
○「国民総幸福(GNH)」議論の行方 http://bit.ly/g0KwZt
「国民総幸福(GNH)」議論の行方,物質的な豊かさだけでなく、精神的な豊かさも尺度に入れた幸福度を捉える考え方は、1970年代にブータンの前国王がGNH(国民総幸福)を提唱したのが始まりだ。1980年代にはGNW(国民総福祉)という考え方もhttp://bit.ly/g0KwZt
○101018C Bhutan, steelguru.com
ブータンの900MWワンデチュ水力でインドのSJVNが詳細設計へ
Hydropower firm SJVN signs deal with Bhutan http://bit.ly/bZyxYY
Hydropower firm SJVN Ltd has signed an agreement
with the Bhutan Government's Department of
Energy for the preparation of a detailed
project report for a 600 MW project in the
Himalayan kingdom.,Wangchhu Hydro electric
Project
○101018D Bhutan, kuenselonline.com
ブータンの1200MWプナチャンチュ水力の工事は順調
Going swimmingly ahead of schedule http://bit.ly/bUsNi2
In turning the country’s biggest hydropower
project of 1,200 MW to a reality, thousands
of men, along with hundreds of machines,
work round the clock, mucking up the mountain
stretch on the left bank of Punatsangchu
river.,en route to Tsirang from Wangdue,into
its second year, since it started in April
2009,4,425 workers, including some 720 Bhutanese,flood
in May last year increased the riverbed diameter
from 10 m to 11 m,7.4 km tunnel with a diameter
of 10 m,about 2.85 km of tunneling was complete,7.5
km approach road,Bhutan will have its biggest
hydropower project ready by October 2014.
○101003C Bhutan, kuenselonline.com
インドのムンバイで開かれたブータンの水力開発の説明会
Indian business eyes Bhutanese hydropower http://bit.ly/btshq3
That was the message, which came through
at the Investment Roadshow in Mumbai, India,
yesterday, attended by more than 300 business
representatives from the cities of Kolkata
and Mumbai. “The Indian market will value
reservoir type of projects due to peaking
shortage,” said Tantra Narayan Thakur, chairman
and managing director of PTC India ltd, in
his presentation on “Electricity trade between
India and Bhutan ? A success story”. Mr
Thakur said that hydropower has become a
priority sector and that Bhutan can help
in meeting the power shortage in India.
○101002A Bhutan, dnaindia.com
ブータンの政府ミッション,インド企業と水力開発で合弁へ
Bhutan likely to ink JVs with Indian power
PSUs in hydro power http://bit.ly/bgXYzc
The Bhutan government is in the process of
finalising agreements with state-run Indian
power companies for setting up joint ventures
in the hydro power sector, a senior minister
in the Bhutanese Government said. "We
are in the process of exchanging agreements
in the hydro power areas to set up joint
ventures with the Indian government-owned
power companies such as NTPC, NHPC and Teri
Hydropower Development Corporation,"
Bhutan Government's Economic affairs minister,
Lyonpo Khandu Wangchuk, said in Mumbai on
the sidelines of an event organised by FICCI.
○100702A Bhutan, kuenselonline.com
ブータン,インドとの協力で2020年までに10,000MW
Wangchhu not a reservoir scheme http://bit.ly/djYcEr
Citing technical and economic reasons the
department of energy has changed the 900
MW Wangchhu reservoir scheme project to a
600 MW a run of the river scheme project.
,department of energy executive engineer,
Tashi Dorji,10 hydropower projects,10,000
MW of power by 2020
Sankosh, Bunakha and Amochhu projects,detailed
project report (DPR) of 180-MW Bunakha hydroelectric
plant,Tehri hydro development corp
990 MW Punatsangchhu II (PII),Punatsangchhu
I project management,720 MW Mangdechhu project,4,060
MW Sankosh reservoir projects,60 MW Chamkharchhu
I, 650 MW Kholongchhu, 620MW Amochhu reservoir
and the Bunakha reservoir
○100627D Bhutan, kuenselonline.com
ブータンの初めての選挙で選ばれた政府の任期は後2年
Meeting the promises made http://bit.ly/axlagV
With just over two years until the first
democratically elected government’s term
ends, some of its members are beginning to
feel the pressure of not being able to fulfill
the promises they made to their constituency
electorates. ,Nu 34B government of India
(GoI) grant,finance minister Lyonpo Wangdi
Norbu,the remaining Nu 666M.” ,rest 66B
is for hydropower project
○100627E Bhutan, kuenselonline.com
ブータンのプナチャンチュ水力で重機運転者達が不満
July 15 deadline for demands to be met http://bit.ly/aDHjGQ
The drivers of the Hindustan construction
company working for Punatshangchu hydropower
project in Wangduephodrang are thinking to
stop working if the company does not respond
to their plea for a pay raise latest by July
15.,it will be worked out within July 17
50 percent house rent allowance, mosquito
nets and blankets,director general of the
ministry of labour, Pema Wangda
○100503C Bhutan, assamtribune.com
ブータンのダム開発でアッサムの環境グループが懸念表明
Bhutan dams may have negative impact on State http://bit.ly/aBPJW6
(KEY) THIMPHU,Not so well known is the impact
the massive structures,990 MW Punatsangchhu
II hydroelectric project,720 MW Mangdechhu
hydroelectric project,potential of hydropower
in Bhutan is close to 24,000 MW,1,488 MW,India
purchases more than 5,000 MW of electricity
by 2020,environmentalists in Assam,Bibhuti
Lahkar of the biodiversity group Aaranyak,Kurichu
damadverse impact on the local populations
who have never been exposed to such cultural
forces.
○南アジア連合SAARCの第16回定期会合,域内連携送電網の構築
SAARC to prepare electricity roadmap http://bit.ly/9YtATV
(KEY) Thimphu,16th SAARC summit,Thimphu
Declaration,SAARC is considering electricity
trading, supported by enabling markets in
the member states,Bangladesh prime minister
Sheikh Hasina Wajed,regional grid of electricity,Nepal
has the potential of producing 90,000 megawatts,Bhutan
can produce 30,000 megawatts,inter-government
meeting in Dhaka,India, Pakistan, Sri Lanka,
Bhutan, Nepal, Afghanistan, the Maldives
and Bangladesh
●100324B Bhutan, kuenselonline.com
ブータンで990MWプナチャンチュと720MWのマンデチュ着工準備
Pre-construction to kick of soon http://bit.ly/cHANq2
Punatsangchu II and Mangdechu Hydropower
Projects 24 March, 2010 - Pre-construction
work on the 990 MW Punatsangchu II and 720
MW Mangdechu hydroelectric projects is to
start immediately, with Bhutan’s department
of energy signing agreements with two government
of India
○100307A Bhutan, kuenselonline.com
ブータンは,1,200MWのプナチャンチュ第1水力など7000人雇用発生
7,000 new jobs in2010 http://bit.ly/cGUyov
Of the total 6,094 are in the construction
sector and 580 in the management category.
In the construction sector, 2,507 skilled
and 3,587 unskilled workers are required.
The construction of the 1,200 MW Punatsangchhu
I is already underway and the construction
of the 990 MW Punatsangchhu II and 720 MW
Mangdechhu are to begin this year. Although
no details were available on how many slots
will be filled by ...